Wall & Partition Removal
Non-structural and framed partitions, soffits and dropped ceilings removed cleanly, with structural elements identified and left intact.

Interior gut-outs · Licensed Florida GC
Selective demolition is removing specific parts of a building, like interior walls, ceilings, flooring, fixtures or finishes, while the structure and the rest of the space stay in place and often in use. We do it in homes, offices, stores, restaurants and condo units across Miami-Dade, Broward and Palm Beach under Florida license CGC1541479.
State-certified Florida GC
CGC1541479, valid in every county
Demolition experience
Team experience since 2007
South Florida coverage
Miami-Dade, Broward & Palm Beach
A controlled start to finish
Interior demolition is as much about what stays standing as what comes out. A load-bearing wall removed by mistake, a dust cloud through a finished office or debris ground into a tenant's floor all cost more than the demolition itself. Rosemont plans exactly what is removed, how the work area is isolated and how debris leaves the building, all before the first wall is touched.
Non-structural and framed partitions, soffits and dropped ceilings removed cleanly, with structural elements identified and left intact.
Tile, flooring, cabinetry, counters, doors, trim and fixtures removed down to the substrate your contractor needs.
Offices, retail units, restaurants, condos and homes gutted while neighboring spaces, tenants and operations stay protected.
Coordination so electrical, plumbing and HVAC inside the demolition area are safely disconnected before removal begins.
Sealed work areas, protected pathways and planned debris routes keep dust and dirt out of the rest of the property.
Interior debris loaded and removed promptly, with recyclable metals and materials separated where practical.
Our process
We review the space, mark exactly what is removed, identify structure, utilities and finishes that must be protected.
Work areas are sealed, floors and access routes covered, and debris routes agreed before demolition starts.
Live electrical, plumbing or gas in the demolition zone is disconnected, and local permit requirements are identified.
The defined elements come out in a controlled sequence, debris is hauled and the space is broom-clean and ready for what comes next.
Project planning
Active offices, restaurants and homes need stronger containment, quieter methods and tighter scheduling than empty units.
Load-bearing walls, live wiring, plumbing and HVAC must be identified and addressed before any interior element is removed.
Elevators, loading docks, quiet hours and neighbor access shape how fast and in what order the work happens.
South Florida specifics
People use these terms loosely, but they mean different jobs with different permits and prices.
We compare interior and full demolition side by side in interior vs full demolition.
Commercial buildings get no residential exemption under the federal asbestos rules. The owner or operator has to have the area thoroughly inspected before any renovation, and once the regulated asbestos in the work reaches 260 linear feet, 160 square feet or 35 cubic feet, a notice goes to the county program at least 10 working days ahead: DERM in Miami-Dade, the Air Quality program in Broward or the Department of Health in Palm Beach County.
In older South Florida buildings, the usual suspects are 9-inch floor tile and the black mastic under it, popcorn ceilings, drywall joint compound and pipe insulation. Testing comes before anyone scrapes, cuts or grinds.
The flooring side is covered in our VCT floor tile removal guide.
Interior work in a condo or an occupied commercial building runs on the building's rules as much as the city's. Expect to need the association's or landlord's written approval, a certificate of insurance naming them, set work hours, elevator padding and a reserved freight elevator, and a debris route that keeps hallways clean.
We plan those details before the permit is filed, so the building manager isn't surprised on day one.
For HOA and condo approval rules, see demolition in an HOA community.
Most interior demolition needs a permit. Removing walls or ceilings, or disconnecting electrical, plumbing, gas or mechanical systems, goes through the building department where the property sits, and trade work needs its own sub-permits. Florida's $7,500 exemption for single-family homes, in effect since July 1, 2026, covers only cosmetic work outside flood hazard areas, never structural or trade work.
We explain what the exemption does and doesn't cover in our $7,500 permit exemption guide.
Answers before work begins
It is the careful removal of defined interior elements, like walls, ceilings, flooring, fixtures or finishes, while the rest of the building, its structure and any occupied or finished areas stay protected and in service.
Often, yes. Selective demolition is planned so occupied spaces can keep functioning: we isolate the work area, control dust and noise, and schedule the loudest phases around your hours whenever possible.
Work areas are sealed with barriers and negative-air machines where needed, floors and pathways are protected, and debris is removed through planned routes so the rest of the property stays clean.
Permit requirements vary by municipality, and live electrical, plumbing or gas lines inside the demolition area must be safely disconnected first. As a licensed general contractor, Rosemont identifies what applies to your project and includes those responsibilities in the scope.
Selective demolition removes specific elements, like one wall, a kitchen or a suite's finishes, and leaves the rest. Interior demolition, or a gut-out, takes everything inside down to the shell while the exterior walls, roof and structure stay. Full demolition takes the whole building down to the slab or below.
Usually, yes. Removing walls or ceilings, or touching electrical, plumbing, gas or mechanical systems, needs a permit from the city or county building department. Florida's $7,500 permit exemption for single-family homes never covers structural or trade work and doesn't apply in flood hazard areas, so most interior demolition still needs a permit.
For commercial buildings, yes: federal rules require a thorough inspection before any renovation, and a notice to the county program once the regulated asbestos reaches 260 linear feet, 160 square feet or 35 cubic feet. A single-family home is generally exempt from those federal rules, but older floor tile, mastic, popcorn ceilings and pipe insulation are still worth testing before they're disturbed.
Where we work
Explore our services
Plan with confidence
Start with a clear scope
We’ll review the property, access, schedule and desired final condition before pricing the work.