Demolition Contractor in Pembroke Pines, FL
Pembroke Pines is one of Broward's largest cities, extending from older 1960s neighborhoods in the east to large master-planned communities in the west, such as Silver Lakes, Chapel Trail and Pembroke Falls. We do pool removals, home remodel demolition, garage and accessory structure removal, and commercial strip-outs here.
Construction and demolition in Pembroke Pines: what we handle
- Kitchen, bath and whole-home interior demolition
- Garage, shed and accessory structure removal
- Debris hauled away and disposed of responsibly
Neighborhoods we serve in Pembroke Pines
- Silver Lakes
- Chapel Trail
- Pembroke Falls
- Towngate
- Grand Palms
Not listed? We cover the surrounding Broward County area too. Call and ask.
What to know about demolition in Pembroke Pines
- Construction and demolition debris in Pembroke Pines has to go out with Waste Pro, the city's exclusive franchise hauler, unless the contractor owns its own containers. Hiring another dumpster company isn't allowed, and the property owner can be held responsible.
- Most western communities have HOAs that must approve exterior demolition and pool removal.
- Eastern neighborhoods from the 1960s to 1970s may contain asbestos in floor tile and ceilings, so we test before interior demolition.
- Many homes back onto lakes and canals, so we use silt and erosion control.
How demolition permits work in Pembroke Pines
Demolition permits in Pembroke Pines come from the city's Building Department at 601 City Center Way (954-435-6502). Like every Broward city, it also needs Broward County's asbestos certificate before the permit is issued.
A typical Pembroke Pines demolition package includes:
- A signed Broward County Statement of Responsibilities Regarding Asbestos, submitted through Broward ePermits
- Utility disconnect letters for electric, gas, water/sewer and telecom
- A current property survey showing the structures to be removed
- A sewer cap or septic abandonment permit
- Silt fencing, dust control and protection of the public right-of-way where required
For homes with four or fewer units, Broward's asbestos statement review usually takes up to about a week. Commercial buildings and residential buildings with five or more units also need a licensed asbestos survey and a Florida DEP Notice of Demolition at least 10 working days before work starts.
Starting work before the Pembroke Pines permit is issued
Pembroke Pines has something most cities don't: a pre-permit early start agreement. Once the plans have gone through one full review cycle, the Building Department can approve an early start for a fee. It's mostly used on bigger projects where waiting on the final permit would hold up a schedule.
- It needs a recorded Notice of Commencement, the Broward County asbestos certificate, the county's environmental review approval, a certified copy of the contract and a notarized agreement signed by the contractor and the owner
- The early start expires 60 days after approval, with no extensions, and the permit has to be issued within 30 days after that or the site has to be made safe
- Demolition still has to follow the asbestos program, including the Asbestos Notification Statement to Broward County, and existing fire alarm and sprinkler systems have to stay working
Any work done under an early start is at the contractor's risk, since the plans aren't approved yet. We only use it when the schedule really needs it.
Pembroke Pines at a glance
- Named for Pembroke Road and the pine trees along it. Historians tie the Pembroke name to Sir Edward Reed and early local land companies.
- 171,178 residents in the 2020 census, the second largest city in Broward.
Pembroke Pines Demolition FAQ
Can demolition start before the Pembroke Pines permit is issued?
Sometimes. Pembroke Pines offers a pre-permit early start agreement once the plans have completed one full review cycle. It needs a recorded Notice of Commencement, the Broward asbestos certificate and a notarized agreement, it lasts 60 days with no extensions, and the work is at the contractor's risk until the permit is issued.
Do you need HOA approval to demolish in Pembroke Pines?
In most Pembroke Pines communities, yes. HOAs usually require approval before a pool removal or exterior demolition. We provide the scope and documents your HOA needs, and we pull the city permit.
Do you serve Pembroke Pines and nearby cities?
Yes. Rosemont Ventures Group is based in Hollywood and works throughout Broward County, including Pembroke Pines and nearby Miramar, Cooper City, Hollywood and Davie. Call 786-464-4555 for a free written estimate.
Construction and demolition services near Pembroke Pines
Planning a demolition in Pembroke Pines?
- Broward County demolition permits: what the county and your city want
- How much does house demolition cost?
- Demolition timeline: permit to clean lot
- Florida demolition permit guide
- Asbestos and demolition in Florida
- How to prepare a house for demolition
- How to check a Florida contractor's license
- The risks of hiring an unlicensed contractor
- How to demolish a house on a tight lot
Other cities we serve in Broward County
- Fort Lauderdale
- Hollywood
- Wilton Manors
- Oakland Park
- Pompano Beach
- Deerfield Beach
- Coconut Creek
- Coral Springs
- Parkland
- Margate
- Tamarac
- North Lauderdale
- Lauderhill
- Lauderdale Lakes
- Plantation
- Sunrise
- Davie
- Cooper City
- Southwest Ranches
- Weston
- Miramar
- Dania Beach
- Hallandale Beach
- West Park
- Pembroke Park
- Lauderdale-by-the-Sea
- Lighthouse Point
- Hillsboro Beach
- Sea Ranch Lakes
- Lazy Lake