This is original research, not a summary of other websites. Each number below comes from the building department's own published fee schedule or demolition form, and the sources are listed at the bottom with the date of each document. Fee schedules change, often every October 1, so treat this as a snapshot from November 2026 and confirm with the city before you budget.
When we quote a house demolition, the permit and its surcharges are included, so you don't have to work through these schedules yourself.
The data
Demolition permit fees by city, from the official schedules
Base fee for demolishing a single-family house, as listed. Per-trade fees are charged once for each trade (building, electrical, plumbing, mechanical) that has to be inspected.
| Item | How it's charged | Listed demolition fee | Schedule date |
|---|---|---|---|
| Unincorporated Miami-Dade | How it's charged: Flat, per structure | Listed demolition fee: $340 per structure, plus the county's 7.5% surcharge | Schedule date: Implementing order effective June 30, 2025 |
| North Miami | How it's charged: Flat, per structure | Listed demolition fee: $325 per structure, including the mechanical, electrical and plumbing sub-permits | Schedule date: Revised June 2026 |
| North Palm Beach | How it's charged: Flat | Listed demolition fee: $304 for building demolition | Schedule date: Current posted schedule |
| Pinecrest | How it's charged: Flat, per structure | Listed demolition fee: $272 per structure | Schedule date: Effective January 4, 2021 |
| Coral Springs | How it's charged: Per trade | Listed demolition fee: $228 structural; $190 each for electrical, plumbing and mechanical | Schedule date: Current posted schedule (2026) |
| Sunrise | How it's charged: Per trade | Listed demolition fee: $222.44 per trade ($55.61 at application, $166.83 at issue) for structural, mechanical, electrical and plumbing | Schedule date: Effective October 1, 2025 |
| Pembroke Pines | How it's charged: Per trade | Listed demolition fee: $121.61 per structure per trade, adjusted for inflation each October 1 | Schedule date: Adopted October 1, 2024 |
| Surfside | How it's charged: Per trade | Listed demolition fee: $80 per trade inspecting | Schedule date: Ordinance 19-1706 |
| Homestead | How it's charged: Percentage | Listed demolition fee: 2.0% of the value of the work | Schedule date: Ordinance 2025-09-25 |
| Jupiter | How it's charged: Percentage | Listed demolition fee: The greater of 2% of the demolition cost or $250, waived if the Town finds the structure unsafe | Schedule date: Town demolition form |
Not listed: Fort Lauderdale, City of Miami, Pompano Beach, Doral, Palm Beach Gardens and unincorporated Broward County publish fee schedules with no separate demolition line for a house. In those places the fee is set under a general permit rate or by the building official, so ask the department how a demolition is charged before you budget.
What the numbers show
Five things we learned reading the fee schedules
There are three pricing systems, not one
Miami-Dade County, North Miami and Pinecrest charge a flat fee per structure. Surfside, Pembroke Pines, Coral Springs and Sunrise charge per trade, so the total depends on how many trades the department makes you pull. Homestead and Jupiter charge a percentage of the job, which means a $25,000 demolition carries a $500 base fee in both.
Per-trade fees add up fast
In Sunrise, one trade costs $222.44. If a demolition needs structural, electrical, plumbing and mechanical permits, the base fees alone come to $889.76. In Coral Springs the same four trades total $798. Ask early which trades your job needs.
The asbestos notice can cost as much as the permit
A house demolition needs an asbestos notice to the county program. Miami-Dade charges $225 for a demolition up to 5,000 square feet. Palm Beach County's Health Department charges $250 for a structure under 30,001 square feet, and $50 per unit for mobile homes.
Some of the biggest charges aren't called 'permit'
Miami Beach adds a sanitation surcharge of 0.30% of the job value to demolition permits, from $15 up to $1,926. The City of Miami adds a residential solid waste surcharge of $0.22 per $100 of construction cost, between $26 and $600. West Palm Beach charges $1.50 per cubic yard of debris if you haul your own.
Old schedules are still online
Unincorporated Miami-Dade's demolition fee was $171.74 per structure in its 2022 schedule, which is still posted on the county website. The June 2025 order lists $340. If you find a fee online, check the effective date before you trust it.
The rest of the bill
Charges that ride along with a demolition permit
These are added to the base fee, or paid to another agency, on a typical South Florida house demolition.
| Item | Where | Amount |
|---|---|---|
| State surcharge, Florida Building Commission (s. 553.721) | Where: Statewide | Amount: 1% of the permit fee, $2 minimum |
| State surcharge, Building Code Administrators and Inspectors Fund (s. 468.631) | Where: Statewide | Amount: 1.5% of the permit fee, $2 minimum |
| Board of Rules and Appeals surcharge | Where: Broward cities | Amount: $0.52 per $1,000 of construction cost, $2 minimum |
| County code compliance fee | Where: Miami-Dade cities | Amount: $0.60 per $1,000 of work value in many schedules; North Miami's and Doral's 2026 schedules list 5% of the base permit fee |
| RER surcharge | Where: Unincorporated Miami-Dade | Amount: 7.5% of building permitting fees |
| Asbestos demolition notice | Where: Miami-Dade County | Amount: $225 up to 5,000 sq ft; $400 above |
| Asbestos demolition notice | Where: Palm Beach County | Amount: $250 under 30,001 sq ft; mobile homes $50 per unit |
| Sanitation surcharge on demolition permits | Where: Miami Beach | Amount: 0.30% of job value, $15 minimum, $1,926 maximum |
| Residential solid waste surcharge | Where: City of Miami | Amount: $0.22 per $100 of construction cost, $26 minimum, $600 maximum |
| Solid waste surcharge | Where: Pinecrest | Amount: $0.20 per $100 of value, $25 minimum, $500 maximum |
| Self-haul debris fee | Where: West Palm Beach | Amount: $1.50 per cubic yard, figured from the building's size |
| Up-front deposit | Where: Boca Raton | Amount: 1% of the contract value, $100 minimum, credited toward the permit |
| Sidewalk bond | Where: North Bay Village | Amount: $500 for a single-family home |
Technology, training and plan review fees vary by city and aren't listed here. Many cities also require separate permits for a construction fence, a sewer cap or septic abandonment, or a roll-off container.
Method
How we did this research
Official documents only
We used each building department's own fee schedule, implementing order or demolition form, downloaded from the government website. No third-party estimates, permit services or cost websites.
One scenario
We looked for the fee to fully demolish a single-family house. Where a schedule listed separate residential and commercial rates, we used residential.
We recorded what's written, not what we'd guess
If a schedule had no demolition line, we left that city out of the main table and said so, instead of assuming the general rate applies.
We dated every number
Each figure is tied to the schedule date shown in the table. Many South Florida departments adjust fees every October 1, so newer numbers may exist by the time you read this.
Our take
What this means for your demolition budget
The permit is a small slice
For most house demolitions, the permit fees are a few hundred dollars to about a thousand. The asbestos survey, utility disconnects, sewer cap and hauling cost far more.
Read your city's own page
Our permit guides walk through the process, forms and timing for the busiest departments.
The asbestos side
Why every house demolition needs a notice, and what a survey costs.
Sources
The fee schedules we used
Miami-Dade County
Implementing Order 4-63, effective June 30, 2025; the 2022 schedule is still posted; asbestos notice fees effective October 1, 2024.
Miami-Dade cities
North Miami, Pinecrest, Surfside, Homestead, Miami Beach, City of Miami and Doral.
Broward
Coral Springs, Sunrise, Pembroke Pines, Fort Lauderdale and Broward County.
Palm Beach
North Palm Beach, Jupiter, West Palm Beach, Palm Beach Gardens and the county Health Department.
Related
Keep reading
House demolition cost in South Florida
Where the real money goes on a teardown.
Florida demolition permit guide
The steps to get a permit anywhere in the state.
Miami demolition permit wait times
How long the permit actually takes.
Asbestos testing and removal cost
The survey and notice that come before the permit.
Common questions
Frequently asked questions
How much is a demolition permit in South Florida?
It depends on the city. In the 2026 fee schedules we reviewed, flat fees run from $272 per structure in Pinecrest to $340 in unincorporated Miami-Dade, per-trade fees run from $80 a trade in Surfside to $222.44 a trade in Sunrise, and Homestead and Jupiter charge 2% of the job's value. State surcharges of 2.5% and a county asbestos notice fee are added on top.
How much is a demolition permit in unincorporated Miami-Dade County?
The county's fee order effective June 30, 2025 lists $340 per structure for demolition of buildings, plus a 7.5% RER surcharge. The asbestos demolition notice is a separate $225 for up to 5,000 square feet.
Why do some cities charge a demolition fee for each trade?
Cities like Surfside, Pembroke Pines, Coral Springs and Sunrise charge per trade because each trade has its own inspection, such as the electrical and plumbing disconnects. The total depends on how many trades the department requires for your job.
Does Fort Lauderdale have a demolition permit fee?
Fort Lauderdale's posted building fee sheet has no separate demolition line. Its general rate for master and stand-alone permits is 1.75% of construction cost with a $131 minimum. Ask the Development Services Department how a demolition will be charged.
How much is the asbestos notification fee for a house demolition?
In Miami-Dade it's $225 for a demolition up to 5,000 square feet. In Palm Beach County the Health Department charges $250 for a structure under 30,001 square feet, or $50 per mobile home unit.
Are demolition permit fees going up?
Many South Florida departments adjust fees every October 1, often by the inflation rate. Pembroke Pines and Miami-Dade County both build annual adjustments into their schedules, so check the effective date on any fee you find.
This is a snapshot of published fee schedules as of November 2026, compiled by Rosemont Ventures Group. Fees change, many cities adjust them every October 1, and a schedule can be updated after we read it. Always confirm the current fee with the building department before you budget. Totals depend on the trades, surcharges, reviews and other permits your job requires.