Skip to main content
Rosemont Ventures Group home
ROSEMONTVentures Group LLC
Español
All service areas

Demolition Company and Contractor in Miami, FL

The City of Miami covers neighborhoods from Coconut Grove and Little Havana to Little River and Brickell, so projects range from 1920s bungalow teardowns to downtown commercial strip-outs. We handle residential, commercial and interior demolition throughout the city, and we pull every permit under our own state-certified general contractor license, CGC1541479.

Construction and demolition in Miami: what we handle

  • Permit applications and utility disconnects handled with the City of Miami building department
  • Dust, noise and traffic control plans for tight urban lots
  • Debris hauling and responsible disposal included in every quote

Neighborhoods we serve in Miami

  • Little Havana
  • Brickell
  • Wynwood
  • Coconut Grove
  • Little Haiti
  • Downtown
  • Coral Way
  • Edgewater
  • Allapattah
  • Overtown
  • Design District
  • Shenandoah
  • The Roads
  • Upper East Side
  • Flagami

Not listed? We cover the surrounding Miami-Dade County area too. Call and ask.

What to know about demolition in Miami

  • Only a licensed contractor can apply for a City of Miami demolition permit. Homeowners can't pull it themselves.
  • The city requires DERM approval before you apply, a certified survey less than six months old, and a tree survey with tree protection drawn onto the demolition plan.
  • Several neighborhoods have historic districts or designated buildings, which need historic preservation review before demolition.

How demolition permits work in Miami

Demolition permits in Miami are issued by the local building department. Because Miami is in Miami-Dade County, the job also goes through the county's Division of Environmental Resources Management (DERM), which reviews sewer and septic connections, trees and other environmental issues, and receives the asbestos Notice of Demolition when one is required.

A typical Miami demolition package includes:

  • Applications go through the city's iBuild and ePlan (ProjectDox) systems
  • A tree survey (less than one year old) with tree protection shown on the demolition plan
  • A sewer cap sub-permit after the demolition permit is issued
  • DERM environmental clearance
  • Utility disconnect letters for electric, gas, water/sewer and telecom
  • A rodent and pest control letter

Single-family homes and buildings with four or fewer units are generally exempt from the federal asbestos notice. Commercial buildings and residential buildings with five or more units need a licensed asbestos survey and a Notice of Demolition filed with DERM at least 10 working days before work starts.

How long a demolition permit takes in Miami

We analyzed the City of Miami's own permit records. Of 1,007 full demolition permits issued from January 2024 to October 2026, the typical one spent 134 days in plan review. About 18% got through within 60 days, and about 16% took more than a year.

By type, the typical time in plan review was:

  • Full demolition of a house: about 122 days
  • Full demolition of a commercial building: about 178 days
  • Interior demolition: about 58 days
  • Detached structures like sheds and garages: about 74 days

That's why we order the survey, the tree survey and the DERM paperwork as soon as you sign, answer reviewer comments fast, and put a realistic permit timeline in the quote instead of promising a few weeks. The full numbers, the trend since 2018 and how we measured them are in our Miami permit wait times study.

Miami's house teardown boom, by the numbers

House teardowns in the City of Miami are at the highest level in the city's permit records. We counted the city's own data for our Miami Teardown Report:

  • 216 full demolitions in single-family and duplex zones by October 23, 2026, already more than any full year since 2018 and up 36% from the same point in 2025
  • 329 full demolitions of every kind by October 23, 2026, up from 278 at the same point in 2025
  • About 59% of the city's full demolitions since 2024 were in single-family and duplex neighborhoods, while demolitions in the high-rise zones fell to 37 so far in 2026
  • In Miami-Dade County's records, about 63% of the houses torn down were owned by an LLC or other company, and the typical one was about 1,950 square feet

For you, that means more competition for contractors and plan reviewers, more demolitions next door, and, if you own an older house, possibly offers for your land. It's one more reason we start the paperwork the day you sign.

City of Miami or unincorporated Miami-Dade? Check first

A lot of addresses that say Miami aren't in the City of Miami. Kendall, Westchester, Olympia Heights and other unincorporated areas get their permits from Miami-Dade County's building department, which runs a different process with different timing. In the county's own records, a single-family home demolition permit was typically issued about 4 days after the application, once the paperwork was ready.

Before we quote a timeline, we check which building department your property falls under, so you plan around the right one.

Flood zones and the 50% rule

Much of Miami is in a flood hazard area. If you're weighing a big renovation against a teardown, Florida's 50% rule matters: when the cost of the work reaches half the building's value, the house generally has to be brought up to current flood rules, which often means elevating it. That's often the point where tearing down and building new makes more sense. Our guide to the 50% rule explains how the math works.

Asbestos in older Miami buildings

Much of Miami was built before asbestos left common building materials, so floor tile, popcorn ceilings and pipe insulation turn up in older houses and commercial buildings. Commercial buildings and residential buildings with five or more units need a licensed asbestos survey and a notice to DERM at least 10 working days before demolition. When abatement is needed, a state-licensed asbestos contractor does it, and we list it as its own line item so you can see what it costs.

Historic properties in the City of Miami

Demolition of a designated historic property in the City of Miami requires a Special Certificate of Appropriateness reviewed by the Historic and Environmental Preservation Board (HEPB), in addition to the regular demolition permit. The city has several designated historic districts, including Morningside, Buena Vista East, Spring Garden, Palm Grove, MiMo/BiBo, Bayside, Riverview, Beverly Terrace, South River Drive and Coconut Grove West. We check a property's historic status before quoting a demolition timeline.

Miami demolition projects we handle

  • Single-family teardowns in neighborhoods such as Little Havana, Allapattah, Shenandoah, Silver Bluff, Coconut Grove and Little River
  • Small apartment buildings and duplexes cleared for redevelopment
  • Commercial and retail strip-outs in Brickell, Downtown, Wynwood and along Biscayne Boulevard
  • Pools, garages, slabs and accessory structures
  • Unsafe structure demolitions with city deadlines

Choosing a demolition company in Miami

Look up demolition contractors in Miami and you'll get a long list, from large firms that mostly chase high-rise work to someone with a truck and a rented excavator. In the City of Miami the first filter is easy: the demolition permit has to be pulled by a licensed contractor, so whoever you hire has to put their own license on the job.

Before you sign, check that:

  • The license is active on the state's DBPR site, and it's the company's own license, not a borrowed one
  • They can send a certificate of insurance with general liability and workers' comp
  • The quote says who handles DERM clearance, the tree survey and the sewer cap sub-permit
  • Asbestos, utility disconnects, fill and grading are either in the price or clearly left out
  • Debris goes to a licensed facility, with disposal tickets to show for it

That's how we work. One contract covers the permit, DERM, utilities, asbestos when it's needed, hauling and leaving the lot graded, and the written quote spells out what's included before you sign anything.

Miami at a glance

  • Incorporated in 1896, the same year the Florida East Coast Railway reached the city. John B. Reilly became its first mayor.
  • Julia Tuttle, one of the city's best known pioneers, moved to the area in 1891.

Official links

Miami Demolition FAQ

How do I choose a demolition company in Miami?

Start with the license, since only a licensed contractor can pull a City of Miami demolition permit. Then get a certificate of insurance and a written quote that says who handles DERM, the tree survey, utilities, the sewer cap, asbestos and final grading. Rosemont Ventures Group is a licensed Florida general contractor (CGC1541479) and handles all of it under one contract.

How much does demolition cost in Miami?

For a house, many South Florida demolitions land somewhere around $6 to $15 per square foot, but block construction, the slab, asbestos, a pool, trees and access can move it well outside that. Commercial jobs are priced on scope. We give a written, itemized quote after seeing the property.

Can a homeowner pull a demolition permit in the City of Miami?

No. The City of Miami only issues demolition permits to qualified licensed contractors. As a licensed Florida general contractor, we apply through iBuild with the DERM approval, survey and tree survey, then pull the sewer cap sub-permit once the demolition permit is issued.

Do you serve Miami and nearby cities?

Yes. Rosemont Ventures Group is based in Hollywood and works throughout Miami-Dade County, including Miami and nearby Coral Gables, Miami Beach, North Miami and Key Biscayne. Call 786-464-4555 for a free written estimate.

Do I need historic approval to demolish a building in Miami?

Only if the property is historically designated or in a designated historic district. In that case, the City of Miami requires a Special Certificate of Appropriateness reviewed by the Historic and Environmental Preservation Board (HEPB) before demolition, in addition to the regular permit. We check the property's status before work is scheduled.

How long does it take to get a demolition permit in Miami?

In the City of Miami, full demolition permits issued since January 2024 spent a median of 134 days in plan review, based on our analysis of 1,007 permits. Homes ran about 122 days and commercial buildings about 178. In unincorporated Miami-Dade, a house demolition permit was typically issued about 4 days after the application. The demolition itself usually takes about 1 to 6 days on site.

Is my Miami address in the City of Miami?

Not always. Many addresses with a Miami mailing address, like much of Kendall and Westchester, are in unincorporated Miami-Dade, where the county issues the permit. Others are in separate cities like Coral Gables or Doral. The Miami-Dade property appraiser's site shows the municipality for any address, and we check it before quoting.

Is your license valid in Miami?

Yes. CGC1541479 is a Florida certified general contractor license, a state certification that's valid in every Florida county, including the City of Miami and the rest of Miami-Dade. We pull permits under our own license, not someone else's.

Google reviews

What customers say about our work in Miami

“Managing a remote renovation from out of town is a real test of patience, but Scott and his crew absolutely nailed it with our Miami property. From start to finish, they handled a full interior gut with incredible precision and zero hassle.

The demo was exact—every designated element came out clean, and nothing extraneous was touched or left behind. Communication was steady the whole way through, so I always knew where things stood. When I finally came down to inspect the space in person, it matched our agreement down to the letter. Finding reliable, trustworthy contractors at a distance is tough, but I wouldn't hesitate to use them again.

Chaim”

Chaim E. · Google review · November 2026Miami, FL

“I’m really happy with the work Rosemont Ventures Group did on my home in Miami. They did a great job with the demolition and kept everything clean and organized. The crew was professional, showed up when they said they would, and took care of the job from start to finish. Everything came out exactly how I wanted. I would definitely recommend them to anyone looking for a good demolition company”

Mark Weiss · Google review · October 2026Miami, FL