Skip to main content
Rosemont Ventures Group home
ROSEMONTVentures Group LLC
Español
All service areas

Demolition Contractor in Miami Beach, FL

Miami Beach has some of the most closely watched demolition rules in Florida. Much of the city is in local historic districts, including the Art Deco and MiMo areas, where demolition needs board approval. We handle condo gut-outs, commercial strip-outs and home teardowns across the city.

Construction and demolition in Miami Beach: what we handle

  • Residential teardowns, interior gut-outs and selective demolition
  • Scheduling that works around Miami-Dade County inspection windows and HOA rules
  • Licensed Florida general contractor, CGC1541479

Neighborhoods we serve in Miami Beach

  • South Beach
  • SoFi
  • Mid-Beach
  • North Beach
  • Flamingo Park
  • Sunset Harbour
  • Venetian Islands
  • Star Island
  • Palm & Hibiscus Islands
  • Normandy Isles

Not listed? We cover the surrounding Miami-Dade County area too. Call and ask.

Project in the City of Miami? We're also a licensed demolition company in Miami, handling DERM and the city permit.

What to know about demolition in Miami Beach

  • Miami Beach has 14 local historic districts. Total demolition of any building in one of them requires approval from the city's Historic Preservation Board at a public hearing. Homes outside historic districts, including those classified as architecturally significant, do not get a separate demolition review.
  • Condo and hotel interior work requires association or management approval and careful scheduling of elevators, loading and noise.
  • Low-lying areas and the city's raised streets affect drainage and site grading after demolition.

How demolition permits work in Miami Beach

Demolition permits in Miami Beach go through the city's Building Department and are filed online through the city's Online Permitting Resource Center. A residential demolition is reviewed by Building, Environmental, Planning, Public Works and the city's Urban Forestry Group, and Miami-Dade County signs off on its part through DERM.

The city's residential demolition checklist asks for:

  • Digitally signed and sealed drawings, a signed and sealed site survey and a topographic/boundary survey
  • A site plan with setbacks, lot dimensions and grade elevations, with elevations listed in NGVD: base flood elevation, grade, adjusted grade and freeboard
  • A tree survey, and when trees are affected, a tree disposition, a tree protection plan and an approved tree permit from the Urban Forestry Group
  • Utility disconnect letters for FPL, gas, water and sewer
  • A letter from the contractor describing dust control, and a construction site sediment and erosion control affidavit
  • A Public Works right-of-way permit when the work uses the street or sidewalk
  • Any recorded order from the Historic Preservation Board, Design Review Board or Board of Adjustment that applies to the property
  • DERM asbestos review when the site has two or more structures, and DERM approval when the property is on the water

Condo, hotel and commercial buildings add a licensed asbestos survey and a Notice of Demolition filed with DERM at least 10 working days before work starts. The commercial checklist also adds life safety plans and a Fire Department review.

Miami Beach property types we demolish

Miami Beach demolition work ranges from single-family homes on the bay to condo and hotel interiors on Collins Avenue and commercial spaces along Lincoln Road and Washington Avenue.

  • Single-family teardowns in neighborhoods such as Sunset Islands, La Gorce, Normandy Isles and Biscayne Point, often on waterfront lots with seawalls and docks
  • Condo and hotel interior gut-outs, coordinated with association or management rules for elevators, loading and quiet hours
  • Retail, restaurant and office strip-outs in busy pedestrian areas that need sidewalk and traffic protection
  • Pool, deck, driveway and seawall-area removals, with debris kept out of the bay

Planning around flooding and new construction

Many Miami Beach lots are low-lying, and new homes are often built higher to meet current flood requirements. When a teardown is followed by new construction, the builder usually needs the old slab and foundation fully removed and the lot graded for the new design. We plan demolition with your architect's site plan in mind so the lot is ready for the next phase.

Miami Beach at a glance

  • Residents voted to incorporate on March 26, 1915, when only a few dozen people lived there.
  • Carl Fisher financed the Collins Bridge, finished in 1913, which first linked the island to the mainland.
  • Pioneers John S. Collins and the Lummus brothers helped develop the early city.

Official links

Miami Beach Demolition FAQ

Do I need board approval to demolish a building in Miami Beach?

Only in certain cases. Total demolition of any building in a local historic district requires approval from the Miami Beach Historic Preservation Board at a public hearing. Outside historic districts, single-family homes, including those classified as architecturally significant, do not need a separate demolition review, though the normal permit, DERM and utility requirements still apply. We check the property's status first so you know the approvals and timeline.

What does Miami Beach require for a house demolition permit?

The city's residential demolition checklist asks for signed and sealed drawings and surveys, a site plan with elevations in NGVD, a tree survey, utility disconnect letters for FPL, gas, water and sewer, a dust control letter, an erosion control affidavit, and a right-of-way permit if the street is used. DERM reviews asbestos when there are two or more structures and signs off on waterfront sites. Applications are filed online through the city's Online Permitting Resource Center.

Do you serve Miami Beach and nearby cities?

Yes. Rosemont Ventures Group is based in Hollywood and works throughout Miami-Dade County, including Miami Beach and nearby Surfside, North Bay Village, Miami and Bal Harbour. Call 786-464-4555 for a free written estimate.

Can you demolish a waterfront home in Miami Beach?

Yes. We demolish bayfront and canal-front homes in Miami Beach while protecting seawalls and docks and keeping debris out of the water. We handle the city permit, DERM requirements, utility disconnects and debris removal.

How long does a home demolition take in Miami Beach?

The demolition itself usually takes about 1 to 6 days on site for a single-family home. Permitting, DERM review and utility disconnects typically take several weeks before work starts, and properties in historic districts need Historic Preservation Board approval first, which adds time.