I'd been running crews as a foreman for a real estate investor on a new home development. When he bought a foreclosed commercial park, he hired me as the contractor to clear out the buildings. I'm writing this because almost everything that can go wrong on an old commercial property was on that one site, and the way we handled it is still how I approach these jobs.
This is the kind of work our commercial demolition service handles today in Miami-Dade, Broward and Palm Beach.
How it started
A contaminated property nobody could afford to fix
The property was cheap for a reason, and the reason was in the ground.
The park was in central New Jersey: nine buildings, about a million square feet in all. It had belonged to a company that did defense work. Somewhere along the way they got careless with wastewater that had chemicals in it, it ended up in the ground, and the groundwater under the property was contaminated.
Cleaning that up cost more than the owner could pay. The company went bankrupt, the property went into foreclosure, and that's how the investor I worked for was able to buy it.
What we walked into
Failed roofs, asbestos tile and chemical drums
By the time we got there, the buildings had been empty long enough for the roofs to give out.
Every building had a flat roof, and by then every one of them had failed. All of the buildings had bad water damage, and almost all of the interiors had to be demolished.
The former owner told us up front that a lot of the floor tile was asbestos. Knowing that before we started told us which areas had to be handled differently.
Some of the buildings still had big chemical drums inside. We didn't touch them. A licensed environmental company came in and removed them properly, and the EPA, which already knew about the site, came out to inspect while the work was going on.
The surprise
The raised floors paid for the labor
The best surprise on the job was under our feet.
Parts of the buildings had thousands of square feet of raised floors, the kind built to keep computers and equipment off the slab in case of a water leak. The frames underneath were aluminum, and the floor itself was 2-foot by 2-foot metal panels, each with four tiles on top.
There was a recycling plant close to the site that paid for metal and aluminum. The aluminum framing had rubber strips that we had to pull out by hand, with hand tools, before it was worth anything, which made it a lot more labor. It was still worth it. The money from the aluminum and the metal paid for almost all of my labor on the job. I hadn't counted on any of it when I priced the work. It was my first demolition job, and I had no idea what those floors were worth until we started taking them apart.
The hard part
Walls that fought back
Not everything inside was built the way you'd expect.
Some of the interior walls we had to take out weren't sheetrock. For whatever reason, they had been built with three-quarter-inch plywood on both sides. A sheetrock wall comes down fast. A wall sheathed in heavy plywood on both faces is a different job, and those walls took a lot more time and work.
The day I caught them
Copper thieves at the loading dock
Empty commercial buildings attract people who know what's inside them.
One day I noticed a car parked next to the loading dock of one of the buildings that shouldn't have been there. I went in quietly through a back door and found a few men taking apart the copper from the electrical boxes.
I called the police and they caught them red-handed. It turned out they'd been there before: the police recovered copper they had already taken home on an earlier trip.
How it ended
How the investor turned a contaminated site into a profit
The demolition was only half the story. The other half was how the investor protected himself.
The cost of fixing the environmental problem was high. So the investor worked with the town and his engineer to subdivide the property, and made sure the contaminated area ended up on its own separate lot. If the cleanup turned out to be more than he could afford, that would be the only lot at risk.
He sold off the other parcels. In the end he was able to fix the contamination and still make a profit on the whole deal.
What I still use
What that job taught me about commercial demolition
Years later, these are the habits I brought with me to South Florida.
Ask what the owner knows, then verify it
The former owner telling us about the asbestos saved us time, but you never stop at what someone tells you. In Florida, every commercial building needs an asbestos survey and a notice before demolition, whatever anyone says.
Leave the chemicals to the specialists
Drums, tanks and anything with a regulator watching are handled by licensed specialists with their own permits. The demolition gets planned around their work, not the other way around.
Look at everything before you price it
Raised floors, plywood walls, heavy finishes: what's inside a building decides the real cost. I walk every building before I give a price.
Expect walls to surprise you
Old buildings aren't always built the way the plans say. That's why my contracts handle hidden conditions with allowances and written change orders instead of guesses.
Secure an empty building on day one
Copper and metal disappear fast from vacant buildings. Lock it up, keep an eye on it, and don't assume nobody's been inside before you got there.
Talk to an engineer before you buy a problem
Splitting the contaminated area onto its own lot is what made that deal work. If a property has environmental history, get an engineer and an attorney involved before you close.
Related
Keep reading
Industrial and gas station demolition
Tanks, PCB ballasts, mercury and the order of work.
Commercial interior demolition
Gutting offices and retail spaces while the building stays.
Asbestos and demolition in Florida
The survey, the notice and who handles it in each county.
Warehouse demolition
Tilt-up walls, steel frames, racking and slab work.
Common questions
Frequently asked questions
What is a raised access floor?
A floor built on a frame above the concrete slab, common in older offices and computer rooms, so equipment and cabling stay above any water leak. The ones on my first job had aluminum frames and 2-foot by 2-foot metal panels, each with four tiles on top.
Does asbestos floor tile have to come out before a commercial building is demolished?
Regulated asbestos has to be dealt with before demolition. In Florida, every commercial building needs an asbestos survey and a notice at least 10 working days before demolition, and a licensed asbestos contractor removes what the survey finds.
What should I do if I'm buying a commercial property with contamination?
Get an environmental engineer and a real estate attorney involved before you close. On the job I worked, the investor subdivided the property so the contaminated area sat on its own lot, which limited his risk while he sold the other parcels. Whether something like that works for you depends on your property and local rules.
How do you protect a vacant building from copper theft?
Secure it from the first day, check on it regularly and call the police if you see anyone who shouldn't be there. On my first job, thieves had already been in once before we caught them stripping copper from the electrical boxes.
This is a personal account of a job in New Jersey in the 2000s, told from memory; names and the exact location are left out on purpose. Rules differ by state and have changed since then. For a property in Florida today, follow the current state and county requirements described in our other guides, and talk to an engineer and attorney about anything environmental.