We're demolition contractors, and on sites like these our part is the building, the canopy and the slab. The tanks, the lighting waste and any contamination are handled by specialists under their own permits, and the demolition is planned around their work. This post walks through what each of those pieces is, what the county and state require, and the order that keeps a project from stalling. The rules come from Miami-Dade DERM's tank removal form, Florida's storage tank rule 62-761.800 and EPA guidance, as they read in November 2026.
The building itself comes down as part of our commercial demolition service, once the environmental steps are cleared.
What's different
What you'll find on an industrial or gas station site
Most of these items have to be identified and removed before demolition starts, and each one goes to a different place.
| What's on site | Why it matters | Where it goes |
|---|---|---|
| Underground fuel tanks and piping | Why it matters: Regulated by the state and, in Miami-Dade, by DERM. Leaks can contaminate soil and groundwater. | Where it goes: Removed by a certified tank contractor under a removal permit, cleaned and disposed of to industry standards. |
| Fluorescent light ballasts | Why it matters: Ballasts made through 1979 may contain PCBs in a small capacitor. | Where it goes: Kept intact and separated from other waste. Leaking PCB ballasts are handled as regulated waste. |
| Fluorescent lamps | Why it matters: They contain mercury and shouldn't be crushed. | Where it goes: A mercury recycler or consolidation site. |
| Old switches and controls | Why it matters: Silent light switches made before 1991 may contain mercury. | Where it goes: Pulled before demolition and handled with the lamps. |
| Asbestos | Why it matters: Every commercial building needs a survey and a notice at least 10 working days before demolition. | Where it goes: Removed by a licensed asbestos contractor if the survey finds regulated material. |
| Oils, chemicals and equipment | Why it matters: Hydraulic lifts, compressors, drums and process equipment can hold fluids that can't go in a dumpster. | Where it goes: Drained and disposed of by the right waste hauler before the building is cleared. |
Sources: Miami-Dade DERM storage tank removal application; Fla. Admin. Code R. 62-761.800; EPA guidance on fluorescent light ballasts and on light systems in demolition.
Fuel tanks
How underground tanks come out
Tank removal is its own permitted job, with its own inspection and its own report, and it usually sets the schedule for the rest of the site.
A certified contractor does it
Florida's storage tank rule calls for tanks to be removed and disposed of, and integral piping removed or disconnected and capped, by a certified contractor. Tanks can also be closed in place by filling them with inert solid material.
In Miami-Dade, DERM is notified first
DERM's removal application says its inspection coordinator has to be notified two working days in advance of the removal inspection, and the groundwater has to be made accessible to the inspector.
A closure report follows
In Miami-Dade, the owner submits a Tank Closure Assessment Report to DERM within 60 days of removal. Under the state rule, a closure report goes to the county within 60 days when an investigation is required.
Contamination changes the plan
Under the state rule, a failed closure evaluation has to be reported as an incident and then investigated. If that happens, cleanup work can affect what can be built and when.
Lighting and mercury
Light ballasts, lamps and switches
Older industrial buildings and gas stations are full of fluorescent fixtures, and they're easy to overlook until the walls start coming down.
Assume old ballasts contain PCBs
EPA says ballasts manufactured through 1979 may contain PCBs, and if a ballast lacks a "No PCBs" label, it's best to assume it does.
Keep them in one piece
EPA advises avoiding breaking ballasts and handling them separately from other demolition waste. A leaking PCB ballast is a regulated waste with stricter disposal.
Don't crush the lamps
Fluorescent lamps contain mercury. EPA says not to crush them and to take them to a mercury recycler or consolidation site.
Check the switches
EPA notes that silent light switches made before 1991 may also contain mercury, so they come out with the lighting.
The order of work
How a gas station or industrial site gets cleared
The order below keeps each permit and inspection from waiting on another one.
Pull the records
Collect what exists: tank registration and past inspection records, any earlier closure or cleanup reports, old asbestos surveys and the site plan. They tell everyone what to expect.
Order the asbestos survey
The survey and the notice come first, because the notice has to be filed at least 10 working days before demolition.
Clear the hazardous items
Lamps, ballasts, mercury switches, refrigerants, oils and chemicals are removed and sent to the right facilities while the building is still standing.
Remove the tanks
The certified tank contractor pulls the tanks and piping under the removal permit, with the county inspection and the closure report to follow.
Demolish and restore
The canopy, the building, the islands and the slab come down, the debris is hauled with disposal tickets, and the lot is graded for what comes next.
Buying or financing the site
Phase I environmental site assessments
If the property is changing hands or being financed, the environmental questions usually start before demolition is even on the table.
What a Phase I is
A Phase I environmental site assessment reviews the property's history, records and current condition for signs of contamination. It doesn't usually involve sampling soil or groundwater.
The current standard
EPA recognizes ASTM E1527-21 as meeting its All Appropriate Inquiries rule, effective February 13, 2023. Buyers use it to qualify for liability protections under federal law.
When a Phase II follows
If the Phase I finds signs of a problem, like a former tank or a dry cleaner, a Phase II with sampling may be recommended. Its results can change the price, the timeline or the deal.
Why it matters for demolition
A Phase I tells you before you sign a demolition contract whether tank removal or cleanup will be part of the job, so the schedule and the budget account for it.
Before you call for quotes
What to have ready
These make it possible to get a demolition price that won't change once work starts.
A list of what's on site
Tanks, canopies, lifts, process equipment, cold storage. The more a contractor knows, the fewer allowances in the quote.
Environmental reports
Any Phase I, Phase II, tank closure report or asbestos survey you already have.
Who handles the tanks
Decide whether the tank work is contracted separately or coordinated under the demolition contract, and put it in writing.
What happens next on the lot
A new building, a sale or a parking lot changes how far the slab, footings and soil work need to go.
Related
Keep reading
My first demolition job
Asbestos tile, chemical drums and an EPA visit on a contaminated commercial park.
Warehouse demolition
Tilt-up walls, steel frames, racking and slab work.
Asbestos testing and removal cost
What the survey and abatement typically cost, with sources.
DERM approval for demolition
What Miami-Dade's environmental review checks before a permit.
Commercial demolition cost
What drives the price of a commercial teardown.
Common questions
Frequently asked questions
Who removes underground fuel tanks in Florida?
A certified contractor, under Florida's storage tank rule (Fla. Admin. Code R. 62-761.800). The tank is removed and disposed of, or closed in place by filling it with inert solid material, and integral piping is removed or disconnected and capped.
What does Miami-Dade require to remove a storage tank?
A removal application with DERM, with DERM's inspection coordinator notified two working days before the removal inspection and the groundwater made accessible to the inspector. The owner then submits a Tank Closure Assessment Report to DERM within 60 days of removal.
Do old fluorescent light ballasts contain PCBs?
Ballasts made through 1979 may. EPA says that if a ballast doesn't have a "No PCBs" label, it's best to assume it contains PCBs, keep it intact and handle it separately from other demolition waste.
Can fluorescent tubes go in the demolition dumpster?
No. They contain mercury. EPA says not to crush them and to take them to a mercury recycler or consolidation site.
Do I need a Phase I environmental site assessment before demolishing a gas station?
Not for the demolition permit itself, but if you're buying or financing the property, a Phase I is the usual first step, and it tells you in advance whether tanks or contamination will be part of the job. EPA recognizes ASTM E1527-21 as the current standard.
What happens if the soil is contaminated?
Under Florida's tank rule, a failed closure evaluation is reported as an incident and investigated. Cleanup can add time and cost, which is why it pays to know about tanks and past leaks before you set a construction schedule.
Based on Miami-Dade DERM's storage tank removal application, Florida Administrative Code Rule 62-761.800, EPA guidance on fluorescent light ballasts and on light systems in demolition, and EPA's recognition of ASTM E1527-21, as they read in November 2026. Requirements vary by county and site, so confirm with the county environmental program, the tank contractor and an environmental consultant. This is general information, not legal or environmental advice.