Skip to main content
Rosemont Ventures Group home
ROSEMONTVentures Group LLC
Español
All service areas

Demolition Contractor in Biscayne Park, FL

Biscayne Park is a small, tree-covered residential village between North Miami and Miami Shores, known for its log cabin village hall and its 1920s to 1950s homes. Demolition here is mostly single-family: full teardowns for new homes and partial demolition for additions.

Construction and demolition in Biscayne Park: what we handle

  • Concrete, driveway, pool and slab removal with clean site grading
  • Asbestos survey coordination before any structure comes down
  • Full liability and workers' compensation coverage on every job

Working in Biscayne Park

We cover every street and community in Biscayne Park, from single-family homes to commercial buildings, with permits pulled under our state-certified Florida general contractor license, the same license in every county.

Not listed? We cover the surrounding Miami-Dade County area too. Call and ask.

Project in the City of Miami? We're also a licensed demolition company in Miami, handling DERM and the city permit.

What to know about demolition in Biscayne Park

  • The village is known for its tree canopy, so tree protection and any tree removal permits are a big part of planning a teardown here.
  • Many homes date from before 1960, so we plan for possible asbestos in floor tile, roofing and plaster, and check for an old septic system that needs proper abandonment.
  • Streets are narrow and residential, so we schedule deliveries and debris haul-outs to keep the road open.

How demolition permits work in Biscayne Park

Demolition permits in Biscayne Park come from the village's Building Department (305-899-8000). Because Biscayne Park is in Miami-Dade County, the job also goes through the county's Division of Environmental Resources Management (DERM), which reviews sewer and septic connections, trees and other environmental issues, and receives the asbestos Notice of Demolition when one is required.

A typical Biscayne Park demolition package includes:

  • DERM environmental clearance
  • Utility disconnect letters for electric, gas, water/sewer and telecom
  • A current property survey showing the structures to be removed
  • A sewer cap or septic abandonment permit
  • A rodent and pest control letter

Single-family homes and buildings with four or fewer units are generally exempt from the federal asbestos notice. Commercial buildings and residential buildings with five or more units need a licensed asbestos survey and a Notice of Demolition filed with DERM at least 10 working days before work starts.

Biscayne Park at a glance

  • Incorporated as a town in 1931 and became the Village of Biscayne Park on June 16, 1933.
  • Its founders made the village a bird sanctuary, and harming birds there is still illegal.
  • About 0.64 square miles and 3,117 residents in the 2020 census.

Official links

Biscayne Park Demolition FAQ

Who issues demolition permits in Biscayne Park?

The Village of Biscayne Park's Building Department, phone 305-899-8000. Miami-Dade DERM handles the county side, including the septic or sewer clearance, and the village's tree rules matter on almost every lot here.

Do you do house demolition in Biscayne Park?

Yes. We handle full and partial home demolition in Biscayne Park, including the village permit, DERM sign-offs, utility disconnects, tree protection and septic abandonment where needed.

Do you serve Biscayne Park and nearby cities?

Yes. Rosemont Ventures Group is based in Hollywood and works throughout Miami-Dade County, including Biscayne Park and nearby Miami Shores, North Miami, El Portal and North Miami Beach. Call 786-464-4555 for a free written estimate.