Demolition Contractor in Coral Gables, FL
Coral Gables is one of South Florida's most regulated cities for construction. It was planned in the 1920s around Mediterranean Revival architecture, and it protects that character closely. We handle home teardowns, partial demolition for remodels, and commercial interior work along Miracle Mile and Ponce de Leon Boulevard.
Construction and demolition in Coral Gables: what we handle
- Historic district and Board of Architects permit coordination
- Selective demolition that protects structures being preserved
- Licensed, insured and experienced with Gables inspections
Neighborhoods we serve in Coral Gables
- Miracle Mile
- Coral Gables Riviera
- Old Cutler
- Granada
- Gables by the Sea
- Cocoplum
- Gables Estates
- Country Club Prado
Not listed? We cover the surrounding Miami-Dade County area too. Call and ask.
Project in the City of Miami? We're also a licensed demolition company in Miami, handling DERM and the city permit.
What to know about demolition in Coral Gables
- Before most demolitions, the city's Historical Resources & Cultural Arts department reviews whether the structure is historically significant. A designated or eligible building can't be demolished without further approval, so this check comes first.
- Coral Gables is known for its tree canopy and strict tree protection, so a tree survey and protection plan are usually part of the demolition package.
- Many 1920s to 1950s homes contain plaster, old tile and other materials that may contain asbestos, so we schedule testing early.
How demolition permits work in Coral Gables
Demolition permits in Coral Gables go through the city's Development Services Department, Building Division (305-460-5242). Before the permit can be issued, a building that isn't already historically designated needs a Historical Significance Determination letter approved by the city's Historic Preservation Officer.
A typical Coral Gables demolition package includes:
- A historic significance determination from Coral Gables Historical Resources before demolition
- DERM environmental clearance
- Utility disconnect letters for electric, gas, water/sewer and telecom
- A current property survey showing the structures to be removed
- A sewer cap or septic abandonment permit
- A rodent and pest control letter
Single-family homes and buildings with four or fewer units are generally exempt from the federal asbestos notice. Commercial buildings and residential buildings with five or more units need a licensed asbestos survey and a Notice of Demolition filed with DERM at least 10 working days before work starts.
The historic letter, the appeal window and work hours
- The Historical Significance Determination letter is posted online, and any citizen can appeal it within 10 days of posting. We plan the schedule around that window.
- An approved letter is good for 18 months. If the demolition permit isn't issued in that time, the letter expires.
- If the officer thinks the building could be a local landmark, it can go to the Historic Preservation Board, with a hearing within 90 days of the eligibility decision.
- Construction is allowed from 7:30 AM to 6:00 PM on weekdays. On Saturdays, exterior work in residential areas is restricted, and there's no construction on Sundays or city-recognized federal holidays, including December 24.
- The city asks that buildings, attics and roofs be checked for endangered bats before demolition. If roosting bats are found, work stops and the U.S. Fish and Wildlife Service is called.
Coral Gables at a glance
- Developer George Merrick built Coral Gables during the 1920s land boom, and it was incorporated in 1925.
- It was planned on the City Beautiful movement and is known for strict zoning and design review.
- The University of Miami was established here the same year the city incorporated.
- 49,248 residents in the 2020 census.
Official links
Coral Gables Demolition FAQ
What hours can demolition happen in Coral Gables?
Weekdays from 7:30 AM to 6:00 PM. Exterior work in residential areas is restricted on Saturdays, and all construction is banned on Sundays and on city-recognized federal holidays, including December 24. The city takes online applications for special or emergency hours.
Do I need historic approval to demolish a house in Coral Gables?
Usually you need at least a determination. Coral Gables' Historical Resources department reviews whether a structure is historically significant before a demolition permit is issued. If it isn't significant, the permit can move forward. If it is designated or eligible, more approvals are required. We request this determination at the start of every Coral Gables job.
Do you serve Coral Gables and nearby cities?
Yes. Rosemont Ventures Group is based in Hollywood and works throughout Miami-Dade County, including Coral Gables and nearby South Miami, West Miami, Miami and Pinecrest. Call 786-464-4555 for a free written estimate.
Construction and demolition services near Coral Gables
Planning a demolition in Coral Gables?
- Miami-Dade County demolition permits: the county and the 34 cities
- How much does house demolition cost?
- Demolition timeline: permit to clean lot
- Florida demolition permit guide
- Asbestos and demolition in Florida
- How to prepare a house for demolition
- How to check a Florida contractor's license
- The risks of hiring an unlicensed contractor
- How to demolish a house on a tight lot
Other cities we serve in Miami-Dade County
- Miami
- Miami Beach
- Aventura
- Hialeah
- Hialeah Gardens
- Doral
- Homestead
- Florida City
- Cutler Bay
- Palmetto Bay
- Pinecrest
- South Miami
- West Miami
- Sweetwater
- Medley
- Miami Gardens
- Miami Lakes
- Miami Shores
- Miami Springs
- North Miami
- North Miami Beach
- North Bay Village
- Bal Harbour
- Bay Harbor Islands
- Surfside
- Sunny Isles Beach
- Golden Beach
- Indian Creek
- Key Biscayne
- Biscayne Park
- El Portal
- Opa-locka
- Virginia Gardens