Demolition Contractor in Golden Beach, FL
Golden Beach is a small, exclusive oceanfront town of large single-family estates at Miami-Dade's northern edge. Teardowns to build new custom homes are common here, and the town has one of the most detailed demolition checklists in South Florida.
Construction and demolition in Golden Beach: what we handle
- Commercial and retail interior demolition scheduled around tenant hours
- Fixed-price quotes with no surprise disposal charges
- Broom-clean sites handed over ready for the next trade
Working in Golden Beach
We cover every street and community in Golden Beach, from single-family homes to commercial buildings, with permits pulled under our state-certified Florida general contractor license, the same license in every county.
Not listed? We cover the surrounding Miami-Dade County area too. Call and ask.
What to know about demolition in Golden Beach
- Golden Beach requires several permits to pass final inspection before the demolition permit is even accepted: a sewer capping permit, a construction fence permit with green or black windscreen, an NPDES erosion control permit, and a portable toilet permit.
- The town requires wet demolition (dust suppression), a cash bond, and a separate bond for re-grading and re-vegetating the lot.
- Work hours are limited, construction can only start at 8:00 AM, and heavy equipment can't be stored on site overnight or on weekends without special approval.
How demolition permits work in Golden Beach
Demolition permits in Golden Beach are issued by the local building department. Because Golden Beach is in Miami-Dade County, the job also goes through the county's Division of Environmental Resources Management (DERM), which reviews sewer and septic connections, trees and other environmental issues, and receives the asbestos Notice of Demolition when one is required.
A typical Golden Beach demolition package includes:
- Sewer capping, construction fence, NPDES and portable toilet permits, each with a passed final inspection before the demolition application
- A rodent treatment letter and a notarized affidavit for removal of mechanical equipment
- A cash bond and a re-grading/re-vegetation bond at permit pickup
- Signed and sealed demolition, grading and drainage plans, and a survey no more than six months old
- Utility disconnect letters for electric, gas, water/sewer and telecom
- DERM environmental clearance from Miami-Dade County
Single-family homes and buildings with four or fewer units are generally exempt from the federal asbestos notice. Commercial buildings and residential buildings with five or more units need a licensed asbestos survey and a Notice of Demolition filed with DERM at least 10 working days before work starts.
Working hours and site rules in Golden Beach
Golden Beach is strict about what happens on a job site, and the town can issue a stop work order and fine the property for each violation. These are the rules we plan every Golden Beach demolition around:
- Demolition is allowed only from 8:00 AM to 6:00 PM on weekdays, under Town Code Sec. 14-84. No work on Saturdays, Sundays, New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving or Christmas, and the gates can't open before 8:00 AM.
- No heavy equipment or trailers parked on the lot overnight or on weekends without a special exception permit.
- A perimeter chain link fence with black or green windscreen, kept tight, with the gates locked and the dumpster covered by the end of each day.
- The street swept at least twice a day, and any debris that isn't in the dumpster removed within 24 hours.
- Trucks can't block town roads or park along the curb. Trucks or equipment in the road need a certified flagman or a town duty officer, and work on Ocean Boulevard needs an FDOT lane closure permit.
- Any damage to town sidewalks, curbs or other infrastructure is repaired at the owner's or contractor's expense.
With a short workday and no weekends, a Golden Beach teardown usually takes more calendar days than the same house would in a neighboring city. We build that into the schedule we give you.
Golden Beach at a glance
- Incorporated on May 23, 1929.
- The Strand is the only road into town, and a police guardhouse watches it, so every truck and crew is cleared at the gate.
- 961 residents in the 2020 census, on about 0.41 square miles.
Official links
Golden Beach Demolition FAQ
What hours can demolition happen in Golden Beach?
Only from 8:00 AM to 6:00 PM on weekdays. Town Code Sec. 14-84 bans demolition on Saturdays, Sundays and six holidays, and the site gates can't open before 8:00 AM. The town manager can allow emergency work for up to three working days.
What does Golden Beach require before a demolition permit?
Golden Beach requires several separate permits to pass final inspection before it will accept a demolition permit, including sewer capping, perimeter construction fencing, NPDES erosion control and a portable toilet. The town also requires utility disconnect letters, a rodent treatment letter, wet demolition, a survey less than six months old, and bonds at pickup. We put the full package together for you.
Do you serve Golden Beach and nearby cities?
Yes. Rosemont Ventures Group is based in Hollywood and works throughout Miami-Dade County, including Golden Beach and nearby Sunny Isles Beach, Aventura and Hallandale Beach. Call 786-464-4555 for a free written estimate.
Construction and demolition services near Golden Beach
Planning a demolition in Golden Beach?
- Miami-Dade County demolition permits: the county and the 34 cities
- How much does house demolition cost?
- Demolition timeline: permit to clean lot
- Florida demolition permit guide
- Asbestos and demolition in Florida
- How to prepare a house for demolition
- How to check a Florida contractor's license
- The risks of hiring an unlicensed contractor
- How to demolish a house on a tight lot
Other cities we serve in Miami-Dade County
- Miami
- Miami Beach
- Coral Gables
- Aventura
- Hialeah
- Hialeah Gardens
- Doral
- Homestead
- Florida City
- Cutler Bay
- Palmetto Bay
- Pinecrest
- South Miami
- West Miami
- Sweetwater
- Medley
- Miami Gardens
- Miami Lakes
- Miami Shores
- Miami Springs
- North Miami
- North Miami Beach
- North Bay Village
- Bal Harbour
- Bay Harbor Islands
- Surfside
- Sunny Isles Beach
- Indian Creek
- Key Biscayne
- Biscayne Park
- El Portal
- Opa-locka
- Virginia Gardens