Miami-Dade County
State-certified Florida GC · CGC1541479
Demolition Contractor in Miami-Dade County
We demolish houses, commercial buildings, pools and interiors across Miami-Dade County, in all 34 cities and the unincorporated areas like Kendall and Westchester. Our state-certified general contractor license (CGC1541479) is valid in every building department in the county, and one contract covers the permit, the utility disconnects, the sewer cap or septic, the hauling and the cleanup.
For the paperwork side, see our Miami-Dade County demolition permit guide, which walks through the county and each city's checklist.
What we demolish in Miami-Dade
From a house teardown in Kendall to a commercial building in Doral, the work runs under the same license and the same process.
House demolition
Full teardowns of houses, duplexes and small apartment buildings in Miami-Dade, from the permit and utility disconnects to a clean, graded lot.
Residential demolitionCommercial demolition
Stores, offices, warehouses and multi-story buildings, with the asbestos survey and notice handled before anything comes down.
Commercial demolitionInterior demolition
Kitchen and bath tear-outs, tenant buildouts and full interior gut-outs where the structure stays standing.
Selective interior demolitionPools, slabs and driveways
Inground pool removal or fill-in, house slabs, driveways and patios broken out and hauled away.
Pool demolitionDebris hauling and site clearing
Construction debris removal with disposal tickets, plus clearing of trees, stumps and brush on vacant lots.
Construction debris removal
How a demolition works in Miami-Dade County
In Miami-Dade the first question is which building department the property belongs to, because the county and each city run their own permits.
The county or your city issues the permit
Unincorporated properties, whose folio numbers start with 30, go to the county's building department. Properties inside one of the 34 cities go to that city.
Who issues the permitSome reviews stay with the county
Even when a city issues the permit, the county can review Water and Sewer, impact fees, DERM, Fire Rescue and the Health Department for septic tanks.
DERM approval for demolitionAsbestos comes before demolition
Commercial buildings and larger residential buildings need an asbestos survey and a notice filed at least 10 working days before work starts, with DERM approving the asbestos review.
Asbestos and demolitionSewer cap or septic abandonment
A house on public sewer gets the line capped under a plumbing permit. A house on septic needs the tank abandoned under a Health Department permit, and many older Miami-Dade neighborhoods are still on septic.
Sewer caps and septic abandonmentTiming depends on the jurisdiction
In our analysis of public records, a house demolition in unincorporated Miami-Dade was typically permitted in 4 days. In the City of Miami, a full demolition spent a median of 134 days in plan review.
Miami permit wait times
Demolition in Miami-Dade right now
Miami-Dade is in the middle of a house teardown wave, and that changes how long things take and who you're competing with.
Record house teardowns in the City of Miami
Through October 23, 2026, the City of Miami issued 329 full demolition permits, compared with 278 at the same point in 2025.
The Miami Teardown ReportMost torn-down houses are owned by companies
About 63% of the houses demolished in Miami-Dade County's records were owned by an LLC or other company, which points to investors and builders driving the trend.
Teardown or flip: a guide for investorsHistoric review in Coral Gables and Miami Beach
Older houses in Coral Gables and buildings in Miami Beach's historic districts can need board review before a demolition permit moves.
Coral Gables historic reviewCities we serve in Miami-Dade County
Pick your city for local permit notes, neighborhoods and reviews.
- Aventura
- Bal Harbour
- Bay Harbor Islands
- Biscayne Park
- Coral Gables
- Cutler Bay
- Doral
- El Portal
- Florida City
- Golden Beach
- Hialeah
- Hialeah Gardens
- Homestead
- Indian Creek
- Key Biscayne
- Medley
- Miami
- Miami Beach
- Miami Gardens
- Miami Lakes
- Miami Shores
- Miami Springs
- North Bay Village
- North Miami
- North Miami Beach
- Opa-locka
- Palmetto Bay
- Pinecrest
- South Miami
- Sunny Isles Beach
- Surfside
- Sweetwater
- Virginia Gardens
- West Miami
Google reviews
Reviews from Miami-Dade County clients
“Managing a remote renovation from out of town is a real test of patience, but Scott and his crew absolutely nailed it with our Miami property. From start to finish, they handled a full interior gut with incredible precision and zero hassle.
The demo was exact—every designated element came out clean, and nothing extraneous was touched or left behind. Communication was steady the whole way through, so I always knew where things stood. When I finally came down to inspect the space in person, it matched our agreement down to the letter. Finding reliable, trustworthy contractors at a distance is tough, but I wouldn't hesitate to use them again.
Chaim”
“I’m really happy with the work Rosemont Ventures Group did on my home in Miami. They did a great job with the demolition and kept everything clean and organized. The crew was professional, showed up when they said they would, and took care of the job from start to finish. Everything came out exactly how I wanted. I would definitely recommend them to anyone looking for a good demolition company”
Miami-Dade demolition questions
Do you work everywhere in Miami-Dade County?
Yes. We work in all 34 cities and in unincorporated Miami-Dade. Our Florida certified general contractor license is a state license, so it's valid with every building department in the county.
Who issues demolition permits in Miami-Dade County?
The building department where the property is. The county handles unincorporated areas, which have folio numbers starting with 30. Each of the 34 cities issues its own permits, while some reviews, like DERM, stay with the county.
How long does a demolition permit take in Miami-Dade?
It depends on where the property is. In our analysis of public records, a house demolition in unincorporated Miami-Dade was typically permitted in 4 days and a commercial one in 35. In the City of Miami, a full demolition spent a median of 134 days in plan review.
Do I need an asbestos survey to demolish a house in Miami-Dade?
Commercial buildings and larger residential buildings need a survey and a notice filed at least 10 working days ahead. Single-family homes are generally exempt from the federal notice, but some cities list a county-approved asbestos notice on their checklist, so ask before you assume the house is exempt.
How much does demolition cost in Miami-Dade?
It depends on the size of the building, how much concrete is on the lot and how much debris has to be hauled. Permits, utility disconnects and septic work are priced separately. Our cost estimator gives a starting range, and we quote after seeing the property.
My property got an unsafe structure notice. What now?
The owner has to repair or demolish the building, and can contest the finding before the county's Unsafe Structures Board. The City of Miami holds its own hearings. Deadlines are short, so call a contractor who can start the permit right away.
Miami-Dade demolition guides
- Miami-Dade County demolition permits
- Demolition cost estimator
- City of Miami demolition permit, step by step
- DERM approval for demolition
- How long Miami demolition permits take
- The Miami Teardown Report
- Demolition in Miami Beach historic districts
- Coral Gables demolition and historic review
- Florida's 50% rule: renovate, elevate or tear down
Planning a demolition in Miami-Dade County?
Call or send the details of the property, and we'll tell you what the job involves and what it costs.
Call 786-464-4555